preparing the site
Before
any new building could take place the site needed
to be cleared. This involved demolishing the existing
buildings and clearing any resulting waste materials.
During
this process over 1000 tonnes of concrete were
recycled on site by our concrete crushing machinery
before being laid and reused as a hardcore layer
on the new site.